Booth King provided structural engineers and technicians to William Hare to assist them with the design of steelwork to this circa £170M Eco-Store at Drax Power Station.
The project included gantries up to 180m in length, trestles up to 55m high, transfer towers, headhouses, sampling building and a drive tower.